Gilbarco Veeder-Root announces a two-week lead time for Catlow™ Swivels, and CamTwist Breakaways
The COVID-19 Pandemic has affected lead times everywhere. At Gilbarco Veeder-Root our Catlow sourcing, production, and engineering teams have been working hard to resolve delays in order fulfillment. We’ve undertaken steps to decrease the lead time on Catlow Swivels, and CamTwist Breakaways to two weeks, including:
- Adding new suppliers
- Identifying alternative components
- Addressing factory staffing shortages
All alternative components have been tested by our Engineering team to ensure they meet our high standards for functionality and quality. The steps have broadened our supply chain while allowing us to continue delivering high-quality UL products.
ITEM # | DESCRIPTION |
Swivels | |
C720-3/4 | TWISTER SWIVEL (3/4″M X 3/4″F) |
C720-1X1 | TWISTER SWIVEL (1″M X 1″F) |
C720-E25B20 | E25/B20 TWISTER SWIVEL (3/4″M X 3/4″F) |
C720-3/4-E85 | TWISTER SWIVEL-E85 (3/4″M X 3/4″F) |
Breakways | |
CTM100 | CAM TWIST MAGNETIC BREAKAWAY (1″) |
CTM75 | CAM TWIST MAGNETIC BREAKAWAY (3/4″) |
CTM75-E25B20 | E25/B20 CAM TWIST MAGNETIC BREAKAWAY (3/4″) |
CTM75-E85 | E85 CAM TWIST MAGNETIC BREAKAWAY (3/4″) |
CTMVA | CAM TWIST MAGNETIC BREAKAWAY (VAC ASSIST) |
CTM100-L | CAM TWIST LOWER HALF BREAKAWAY (1″) |
CTM75-L | CAM TWIST LOWER HALF BREAKAWAY (3/4″) |